Before it lands
Power and water move a delivery date, not the hardware. Check these against your hall early, and send them with your first message.
A B300 node draws roughly 14 kW. Four of them in a rack is 56 kW, which one 100 kW CDU carries with headroom to spare. The figures below are the reference envelope for a liquid cooled rack. Check them against your hall early, because power and water are what move a delivery date, not the hardware.
Reference envelope for a liquid cooled rack. Your binding figures come from the integration partner's site survey and govern over anything shown here.